欧洲一区二区三区精品,亚洲经典自拍,国产精品福利av http://www.mimgu.com The Leading Supplier of China Amine Catalysts Wed, 10 Aug 2022 09:08:11 +0000 zh-CN hourly 1 https://wordpress.org/?v=6.1.7 http://www.mimgu.com/wp-content/uploads/2023/12/1.jpg 000t/a BDO Project in Xinjiang – Amine Catalysts http://www.mimgu.com 32 32 EIA Approval for Newly-built 2×300,000t/a BDO Project in Xinjiang http://www.mimgu.com/archives/40103 Wed, 10 Aug 2022 09:08:11 +0000 http://www.mimgu.com/archives/40103 Latest News: On August 3rd, the Environmental Impact Assessment and Emission Management Office of the Xinjiang Uygur Autonomous Region Department of Ecology and Environment announced the decision on the approval of the construction project environmental impact assessment document to be made on August 3, 2022. This includes Markor Chemical’s 600,000-ton BDO project.

Project name: Xinjiang Meike Chemical Co., Ltd. 2×300,000 tons/year BDO project

Construction site: Korla Petroleum and Petrochemical Industrial Park

Construction unit: Xinjiang Meike Chemical Co., Ltd.

Construction nature: new construction

Construction scale: The project uses natural gas as raw material to produce BDO, with an annual output of 600,000 tons of BDO. The project is constructed in two phases, each with an annual output of 300,000 tons of BDO.

Construction content of the first phase of the project: 1. Main project: 3×40,000 tons/year natural gas to acetylene plant, 3×240,000 tons/year formaldehyde and hydrogen production plant, 300,000 tons/year BDO plant; 2. Storage and transportation project: Set up 1 hazardous chemical warehouse, 1 general chemical warehouse, 1 comprehensive warehouse, raw material tank farm, intermediate tank farm of each device, gas tank, etc.; 3. Public and auxiliary works: construction project water supply and drainage system, power supply system, Air separation plant, refrigeration station, air compressor station, central laboratory, central control room, maintenance workshop, shift dormitory, etc.; 4. Environmental protection projects: waste gas treatment measures for various installations and public works; production wastewater and domestic sewage are treated by sewage in the plant After the treatment at the station, the purified sewage from the reuse water station is discharged into the sewage treatment plant in the park for further treatment; the temporary storage room for general industrial solid waste, the temporary storage room for hazardous waste, and the noise prevention and control project;

Construction content of the second phase project: 1. Main project: 3×40,000 tons/year natural gas to acetylene plant, 3×240,000 tons/year formaldehyde and hydrogen production plant, 300,000 tons/year BDO plant; 2. Storage and transportation project: Set up 1 hazardous chemical warehouse, 1 general chemical warehouse, raw material tank farm, intermediate tank farm of each device, gas cabinet, etc.; 3. Public and auxiliary works: the water supply and drainage system and power supply system of the second phase project are partly based on the first phase project , part of new construction; new air separation plant, refrigeration station, air compressor station; central laboratory, central control room, maintenance workshop, shift dormitory, etc. all rely on the first phase of the project; 4. Environmental protection projects: waste gas treatment measures for various installations and public works ; After the production wastewater and domestic sewage are treated by the sewage treatment station in the factory, the purified sewage from the reuse water station is discharged into the sewage treatment plant in the park for further treatment; the temporary storage room for general industrial solid waste, the temporary storage room for hazardous waste, and the noise prevention and control project.

Project investment: The total investment of this project is 14,340,220,000 yuan (the first phase is 4,589,555,800 yuan), of which environmental protection investment is 590 million yuan, and environmental protection investment accounts for 3.61% of the total project investment.

]]>
主站蜘蛛池模板: 靖远县| 南川市| 铜山县| 双辽市| 葫芦岛市| 治县。| 钦州市| 罗城| 庆安县| 杭州市| 应城市| 通州区| 柯坪县| 海宁市| 聂荣县| 从化市| 分宜县| 漠河县| 确山县| 武隆县| 长宁县| 清远市| 社会| 陕西省| 太湖县| 湖南省| 根河市| 榆中县| 嘉鱼县| 遵化市| 夏津县| 吴江市| 武汉市| 岢岚县| 龙陵县| 交城县| 满洲里市| 会泽县| 神木县| 灌阳县| 沂水县|